Recommended for use on static dissipative or conductive tile.
RESTORATIVE MAINTENANCE:
Completely remove all old wax, finish and soil from floor surface following strip procedure instructions on Betco stripper label. Floor surface must be clean, dry and free of residue before finish is applied. Rinse with clean water if necessary. Apply finish in uniform, thin to medium coats using a clean synthetic finish mop, microfiber mop or applicator system. Allow first coat to dry thoroughly before applying second coat, usually 30-40 minutes. Elevated temperatures, heavy coats and humidity may extend dry time. 2 coats of finish are recommended.
ROUTINE MAINTENANCE:
Sweep large debris and dust mop. Damp mop using Betco Top Flight cleaner.
INTERIM MAINTENANCE:
Sweep large debris and dust mop. Top scrub the floor using Daily Scrub SC and maroon pad or equivalent to remove the top soiled layer of finish. Floor surface must be clean, dry and free of residue before finish is applied. Apply 1 - 2 coats of finish as directed above.
Please recycle empty container. Note: Slip resistance meets or exceeds standard, (ASTM D 2047-11) James Machine 0.5 minimum.